Trico Product Page
Understanding Snap Ties
Snap ties are essential components in the construction of concrete walls. They serve as a temporary means for holding the two sides of formwork together while the concrete sets. Typically made of high-strength steel, snap ties are designed to resist the lateral pressure exerted by wet concrete during the pouring process. Once the concrete has cured, these ties can be eliminated from the structure, leaving a clean finish.
Preparation Before Use
Before utilizing snap ties for your concrete wall project, several preparatory steps are essential. First, assess the wall design and determine the spacing of the snap ties. Generally, they should be spaced to adequately support the weight of the concrete and prevent bowing of the formwork. Overall, a spacing of 24 inches to 36 inches is standard, but this can vary depending on project specifics.Next, ensure all materials are on-site. You will need snap ties, form panels, shims, and a concrete mix. Additionally, ensure that the environment is conducive for pouring concrete. Cold weather can affect curing, while extreme heat can lead to rapid drying.
Installation of Snap Ties
Installing snap ties requires careful attention to detail. Start by placing the form panels vertically in the desired position. Secure them to a level foundation. Once the formwork is in place, begin inserting the snap ties through pre-drilled holes in the form panels. Position them horizontally.When inserting the ties, emphasize maintaining an even distance from the edges of the formwork. Use a level to ensure that the form panels are perfectly aligned. Each snap tie should be pushed through both sides of the panel until it reaches the desired depth. The activation pin must be secured firmly to lock the tie into place.After the ties are installed, check all connections for stability. You can use shims if necessary to adjust the panels and eliminate any gaps.
Pouring Concrete
With the snap ties securely in place, you can begin pouring concrete. Start at one end and pour consistently from a height to avoid any air pockets. The concrete should be vibrated as it is poured to ensure a proper consolidation within the formwork. This helps eliminate air bubbles and provides a solid structure.Monitor the pouring process closely and maintain a steady flow. Keep an eye on the level of the concrete and adjust accordingly. Once the desired height is reached, allow the concrete to set and cure based on the mix specifications.
Removing Snap Ties
After the concrete has fully cured, the time comes to remove the snap ties. Take precautions by first inspecting the cured wall to ensure it has gained adequate strength. Use a tie cutter or similar tool for a clean break. Snap ties should be broken off flush with the wall’s surface to prevent any protrusions.After removal, inspect for any surface imperfections resulting from the ties. Fill and smooth any minor gaps left behind with appropriate patching material.
Conclusion
Using snap ties in concrete wall construction is a straightforward yet crucial process that improves efficiency and structural integrity. By understanding the preparation, installation, pouring, and removal processes, you can ensure a successful concrete wall project. Should you have any additional questions or require guidance, please feel free to contact us.
Please visit our website for more information on this topic.
The company is the world’s best forming concrete walls snap ties supplier. We are your one-stop shop for all needs. Our staff are highly-specialized and will help you find the product you need.
All Comments ( 0 )